EAST SUSSEX COUNTY COUNCIL’S FORWARD PLAN
The Leader of the County Council is required to publish a forward plan setting out matters which the Leader believes will be the subject of a key decision by the Cabinet, individual Cabinet member or officer in the period covered by the Plan (the subsequent four months). The Council’s Constitution states that a key decision is one that involves
(a) expenditure which is, or the making of savings which are, significant having regard to the expenditure of the County Council’s budget, namely above £500,000 per annum; or
(b) is significant in terms of its effects on communities living or working in an area comprising two or more electoral divisions.
As a matter of good practice, the Council's Forward Plan includes other items in addition to key decisions that are to be considered by the Cabinet/individual members. This additional information is provided to inform local residents of all matters to be considered, with the exception of issues which are dealt with under the urgency provisions. Only key decisions to be taken by officers are included.
For each decision included on the Plan the following information is provided:
- the name of the individual or body that is to make the decision and the date of the meeting or relevant time period for an officer decision
- the title of the report and decision to be considered
- groups that will be consulted prior to the decision being taken
- a list of documents that will be considered when making the decision
- the name and telephone number of the contact officer for each item.
The Plan is updated and published every month on the Council’s website two weeks before the start of the period to be covered.
Meetings of the Cabinet/individual members are open to the public (with the exception of discussion regarding reports which contain exempt/confidential information). Copies of agenda and reports for meetings are available on the website in advance of meetings. Key decisions taken by officers will not be taken at a meeting – documents listed can be made available on request to the contact officer, with the exception of those which contain exempt/confidential information.
For further details on the time of meetings and general information about the Plan please contact Stuart McKeown at County Hall, St Anne’s Crescent, Lewes, BN7 1UE, or telephone 01273 481583 or send an e-mail to stuart.mckeown@eastsussex.gov.uk. For further detailed information regarding specific issues to be considered by the Cabinet, individual Member or officer please contact the named contact officer for the item concerned.
EAST SUSSEX COUNTY COUNCIL
County Hall, St Anne’s Crescent, Lewes, BN7 1UE
For copies of reports or other documents please contact the officer listed on the Plan or phone 01273 335274.
FORWARD PLAN – EXECUTIVE DECISIONS (including Key Decisions) – 1 June 2023 TO 30 September 2023
Additional notices in relation to Key Decisions and/or private decisions are available on the Council’s website.
Cabinet membership:
Councillor Keith Glazier - Lead Member for Strategic Management and Economic Development
Councillor Nick Bennett – Lead Member for Resources and Climate Change
Councillor Rupert Simmons – Lead Member for Economy
Councillor Claire Dowling – Lead Member for Transport and Environment
Councillor Carl Maynard – Lead Member for Adult Social Care and Health
Councillor Bob Bowdler – Lead Member for Children and Families
Councillor Bob Standley – Lead Member for Education and Inclusion, Special Educational Needs and Disability
Date for Decision |
Decision Taker |
Decision/Key Issue |
Decision to be taken wholly or partly in private (P) or Key Decision (KD) |
Consultation
|
List of Documents to be submitted to decision maker |
Contact Officer |
5 Jun 2023 |
Lead Member for Transport and Environment
|
Notice of Motion - Bishopstone Junction, Seaford To consider and respond to the Notice of Motion submitted calling on the County Council to: - Provide temporary traffic lights at the A259 Bishopstone junction to assess the effectiveness of this as a traffic management solution. - Seek to provide a safe route for pedestrians and cyclists, including consideration of a footbridge, over the A259 at Bishopstone using underspends in the County Council’s Active Travel Fund.
|
KD |
|
Report, other documents may also be submitted
|
Isobel Kellett 07513 833903
|
5 Jun 2023 |
Lead Member for Transport and Environment
|
Petition for 20mph default for residential areas To consider the petition asking that the County Council makes 20mph the default for residential areas, reduces speed limits where there are potential deaths and injuries and follow the government guidance on safe speed limits.
|
KD |
|
Report, other documents may also be submitted
|
Claire Scriven 01424 726347
|
12 Jun 2023 |
Lead Member for Adult Social Care and Health
|
Retender of Integrated Health and Wellbeing Service Seeking Lead Member approval to commence re-tendering of the Integrated Health and Wellbeing Service in July 2023. The service provides evidence-based support to enable people across East Sussex to make changes to their lifestyle to improve their health.
|
KD |
|
Report, other documents may also be submitted
|
Nicola Blake 01273 335060
|
Between 12 Jun 2023 and 30 Jun 2023 |
Director of Communities, Economy and Transport
|
Extension of Civil Parking Enforcement Contract Five Year Allowable Extension of Civil Parking Enforcement Contract with NSL Limited.
|
P
KD |
|
Report, other documents may also be submitted
|
Daniel Clarke 01323 464057
|
20 Jun 2023 |
Lead Member for Strategic Management and Economic Development
|
Sussex Integrated Care System (ICS) Shared Delivery Plan (SDP) To enable consideration of the draft joint Sussex Integrated Care System (ICS) Shared Delivery Plan as it relates to delivering the shared ESCC and NHS priorities agreed for the population of East Sussex in the Sussex Integrated Care Strategy.
|
KD |
|
Report, other documents may also be submitted
|
Vicky Smith 01273 482036
|
20 Jun 2023 |
Lead Member for Strategic Management and Economic Development
|
Renewal of subordinated loan for Wave Community Bank (East Sussex Credit Union) Wave Community Bank (trading name of East Sussex Credit Union) has asked East Sussex County Council to extend its £150,000 repayable subordinated loan for ten years, to enable it to assist more residents in the county facing greatest hardship to deal with immediate financial issues and build up savings to help them manage future economic challenges better. The loan was first agreed in 2018 and our agreement is due to end in September 2023.
|
|
|
Report, other documents may also be submitted
|
Alice Pippard 01273 481816
|
21 Jun 2023 |
Lead Member for Education and Inclusion, Special Educational Needs and Disability
|
Proposed Specialist facility at Denton Community Primary School To consider any comments or objections received during the representation period following publication of the statutory notice, and to seek a final decision on establishing a specialist facility at the school.
|
|
|
Report, other documents may also be submitted
|
Gary Langford 01273 481758
|
21 Jun 2023 |
Lead Member for Education and Inclusion, Special Educational Needs and Disability
|
Proposed Specialist facility at Meridian Community Primary School To consider any comments or objections received during the representation period following publication of the statutory notice, and to seek a final decision on establishing a specialist facility at the school.
|
|
|
Report, other documents may also be submitted
|
Gary Langford 01273 481758
|
21 Jun 2023 |
Lead Member for Education and Inclusion, Special Educational Needs and Disability
|
Proposal to lower age range at Punnets Town Community Primary School To seek approval to lower the age range at Punnetts Town Community Primary School from 4-11 to 2-11.
|
|
|
Report, other documents may also be submitted
|
Jane Spice 01323 747425
|
21 Jun 2023 |
Lead Member for Children and Families
|
Youth Centres upgrade The Lead Member is being asked to agree in principle that: 1) The council should accept a provisional grant offer to refurbish the JOFF Youth Centre in Peacehaven and replace Heathfield Youth Centre with a new building; and 2) Work should progress to finalise the grant agreement and, subject to confirmation, procure the work needed to build the centres. 3) The detailed arrangements should be delegated to the Director of Children’s Services to determine, in consultation with the Chief Operating Officer
|
KD |
|
Report, other documents may also be submitted
|
Colin Edgley 01323 464410
|
26 Jun 2023 |
Lead Member for Transport and Environment
|
Notice of Motion to review and update Policy PS05/02 Local Speed Limits To consider and respond to the Notice of Motion submitted calling on the County Council: 1. To request the Lead Member for Transport to demonstrate that PS05/02 and its operational implementation is fully in line with the Circular 01/2013 with a full audit of speed limit assessments completed in the last 2 years. 2. To request that the Lead Member shares the results of this audit with Full Council within two months. 3. That PS05/02 be reviewed within the next two months and be presented to Full Council to ensure it is fully in line with all aspects of Circular 01/2013 4. That community and resident experience, quality of life and fear of speeds are included as explicit criteria in PS05/02 as clearly indicated in Circular 01/2013.
|
|
|
Report, other documents may also be submitted
|
Brian Banks 01424 724558
|
27 Jun 2023 |
Cabinet
|
Reconciling Policy, Performance and Resources (RPPR) - State of the County To consider the State of the County report and begin the Reconciling Policy, Performance and Resources process for 2024/25 and beyond.
|
KD |
|
Report, other documents may also be submitted
|
Victoria Beard 07894 708914
|
27 Jun 2023 |
Cabinet
|
Adult Social Care Strategy Cabinet is requested to agree the proposed plan to launch and implement an adult social care strategy for East Sussex. Noting that the strategy has been developed in response to feedback from local residents about what they need to live well and what is most important to them about care and support.
|
KD |
|
Report, other documents may also be submitted
|
David Bishop 01273 336228
|
27 Jun 2023 |
Cabinet
|
Council Monitoring: Quarter 4 2022/23 - Year end To consider the Council Monitoring report for the fourth quarter of 2022/23 as part of the Council's Reconciling Policy, Performance and Resources process.
|
KD |
|
Report, other documents may also be submitted
|
Victoria Beard 07894 708914
|
27 Jun 2023 |
Cabinet
|
Highway Maintenance Investment To provide an update on the one-off £5.8m investment in Highway maintenance approved by Cabinet in November 2021; and to advise on the impact of the 2022/23 winter on road condition and options for additional investment.
|
KD |
|
Report, other documents may also be submitted
|
Karl Taylor 01273 482207
|
27 Jun 2023 |
Lead Member for Resources and Climate Change
|
Hye House Farm, Crowhurst - Disposal of Freehold Hye House Farm is currently occupied by way of a farm tenancy which is due to expire in September 2023. We are seeking Lead Member approval to formally declare the site to be surplus, and to approve the appointment of an appropriate marketing agent to seek to dispose of the land which will be in separate lots to maximise value. We then ask that the Chief Operating Officer be granted authority to agree detailed terms with the preferred purchaser and if they don’t complete the purchase, to move the next prospective purchaser(s) if appropriate.
|
KD |
|
Report, other documents may also be submitted
|
Rebecca Lewis 07955 312371
|
27 Jun 2023 |
Lead Member for Resources and Climate Change
|
Hastings Waste Treatment Facility Site, Freshfields - Rent Review East Sussex Council are the tenant at the property. There is an outstanding rent review dated 1 April 2023. It is index-linked to the Retail Price Index (RPI). The Lead Member is recommended to agree settlement of the rent review in accordance with the lease.
|
P
|
|
Report, other documents may also be submitted
|
John Tripp 01273 336999
|
June 2023 |
Chief Operating Officer
|
Award of Contract for Sorrel Drive Capital Project A decision is required to enter into a building contract with an ESCC Framework Contractor. The capital project seeks to extend the Sorrel Drive Children’s Resource Centre and carry out further internal alterations in support of children’s day and residential respite care facilities.
|
KD |
|
Report, other documents may also be submitted
|
Nigel Brown 07394 410630
|
June 2023 |
Chief Operating Officer
|
To appoint a Consultant up to RIBA stage 4 for the ESCC youth centres works to The Joff Youth Centre, Peacehaven and Heathfield Youth Centre, Heathfield To award a Consultant for their services up to RIBA stage 4 (Technical Design) for property works to The Joff Youth Centre, Peacehaven and Heathfield Youth Centre using the NHS SBS Framework. The project will need to be delivered using 100% grant funding and there is no proposed ESCC capital funding. Central government will provide formal details of the grant award in May 2023.
|
KD |
|
Report, other documents may also be submitted
|
Nigel Brown 07394 410630
|
June 2023 |
Chief Operating Officer
|
Award of Pre-Contract Services Agreement (PSCA) for the ESCC youth centres for The Joff, Peacehaven and Heathfield Youth Centre, Heathfield to appoint a contractor This is for pre contract services to enable a tender package to be prepared for works to The Joff Youth Centre, Peacehaven and Heathfield Youth Centre. The works will increase the number of regular positive activities and clubs available to young people aged 11 to 19 (up to 25 for young people with Special Educational Needs and Disabilities) in the areas.
|
KD |
|
Report, other documents may also be submitted
|
Nigel Brown 07394 410630
|
June 2023 |
Chief Operating Officer
|
Award of Pre-Contract Services Agreement (PSCA) for feasibility studies in relation to a new Profound and Multiple Learning Disability (PLMD) building for Grove Park Secondary and Sixth Form on a Council owned site in Crowborough This is for pre contract services to enable a tender to be prepared for a new 2000sqm building providing PMLD pupil places for Secondary and Sixth Form pupils on the Grove Park Primary School site. The existing primary school will have minor alterations and a new nursery provision will be provided on the same site. Two mobile classrooms will be removed. Capital funding has been allocated in the Capital Programme to accommodate the new facilities at Grove Park School. The site will therefore have a nursery, primary school and new secondary/sixth form accommodation. The pupils will be between the ages of 2 to 18 years.
|
KD |
|
Report, other documents may also be submitted
|
Nigel Brown 07394 410630
|
June 2023 |
Chief Operating Officer
|
Award of property contract for Adult Social Care's Supported Living Programme A decision is required to enter into a building contract with a contractor procured via the Sout East Shared Services Portal. The capital project seeks to extend/redevelop 2 Adult Social Care homes. This decision is for phase one of the development which will develop Cregg Na Ba, Battle and Beckley Close, St Leonards. Project description: Reconfiguration of 2 Bungalows to provide ensuite facilities for residents. This reflects a change from residential care to supported living offering people a home with security of tenure.
|
KD |
|
Report, other documents may also be submitted
|
Nigel Brown 07394 410630
|
June 2023 |
Chief Operating Officer
|
Freehold Disposal of the former Firstfield Resource Centre, 42 London Road Hailsham The Council own the freehold of the former Firstfields Resource Centre and it is adjacent to an operational asset owned by SEACamb. Both public sector landowners agreed to a joint disposal to maximise the capital receipt. The joint disposal will occur once SEACamb move to their new accommodation which is being procured. Both organisations have jointly marketed for disposal via a property agent and offers have been received and evaluated. The officer decision report will be finalised, recommending a joint disposal to a purchaser on a conditional basis, subject to planning permission. This is subject to SEACamb finalising their vacation of their current operational asset. The Council will secure 70% of the capital receipts on completion.
|
KD |
|
Report, other documents may also be submitted
|
Nigel Brown 07394 410630
|
June 2023 |
Director of Communities, Economy and Transport
|
Hastings Public Realm and Green Connections Consultation and Preliminary Design To consider direct award of the Consultation, Preliminary Design and relevant surveys for the Hastings Public Realm and Green Connections project to Arup. Arup worked on previous design work for this project, led and managed by Hastings Borough Council. This project has £9.834m of funding from Hastings Town Deal and £400k from the Local Growth Fund. This commission is valued at £700k.
|
KD |
|
Report, other documents may also be submitted
|
Ellie McDaniel 01273 335464
|
11 Jul 2023 |
Lead Member for Resources and Climate Change
|
Uckfield Leisure Centre Public Consultation Outcome To note the outcome of the Uckfield Leisure Centre public consultation which concludes on 27 May 2023. To agree next steps for the future operation of Uckfield Leisure Centre. The County Council own the freehold of this asset.
|
P
KD |
|
Report, other documents may also be submitted
|
Nigel Brown, Pauline Young 07394 410630, 01273 481180
|
11 Jul 2023 |
Lead Member for Resources and Climate Change
|
To approve the granting of a new Lease to the Trustees of the West Hills & District Community Centre The current Lease dated 12 March 2008 expires 11 March 2023 and it is proposed that ESCC grant the Trustees a new Lease for a period of 25 years which will allow the Trustees to be able to seek grant funding.
|
P
KD |
|
Report, other documents may also be submitted
|
Joanne Johnston, Zoe Tweed 01273 336621, 07701 021868
|
11 Jul 2023 |
Lead Member for Resources and Climate Change
|
Former Hindsland Playing Fields, Eastbourne Road, Polegate - Disposal of Freehold The land known as Former Hindsland Playing Fields was declared surplus in 1989. At the end of an appropriate marketing period, Officer recommendations for the preferred purchaser will be presented in a Lead Member report to formally declare the site to be surplus, approve the sale and to ask the Chief Operating Officer be granted authority to agree detailed terms with the preferred purchaser and if they don’t complete the purchase, to move the next prospective purchaser(s) if appropriate.
|
P
KD |
|
Report, other documents may also be submitted
|
Rebecca Lewis 07955 312371
|
11 Jul 2023 |
Lead Member for Resources and Climate Change
|
Exceat Bridge Improvement Scheme land acquisition and compensation Various parcels of land subject to acquisition and/or compensation in connection with the Exceat Bridge Improvement scheme. Scheme reported to Cabinet in 2017 and approved as part of the capital programme. Planning permission for the scheme was secured in December 2022.
|
P
KD |
|
Report, other documents may also be submitted
|
Zoe Tweed 07701 021868
|
17 Jul 2023 |
Lead Member for Transport and Environment
|
Petition to increase the safety of the B2095 Lower Street, Ninfield and A259 Marsh Road To decide on the response to the petition calling on the County Council to increase the safety of the B2095, Lower Street, Ninfield to A259 Marsh Road, to take steps to reduce the speed and weight of vehicles and address the growing problem of dangerous and inconsiderate driving.
|
KD |
|
Report, other documents may also be submitted
|
Michael Higgs 01273 482106
|
18 Jul 2023 |
Cabinet
|
Exceat Bridge Compulsory Purchase Order, Bridge Order and Side Roads Order The Exceat Bridge project involves the realignment and replacement of the existing single lane bridge at the A259 over the river Cuckmere with a new two-lane bridge with a footway. The Project will deliver a major improvement in the highway connection between Eastbourne and Seaford. The Council needs to secure additional land for the Project. Whilst the Council is seeking to negotiate acquisition of the land by voluntary agreement, it is proposed to make a Compulsory Order in case any negotiations prove unsuccessful. As the works will cross a river and involve diversion of footpaths, it is also proposed to make a Bridge Order under the Highways Act 1980 and Side Roads Order in order to deliver the Project.
|
P
KD |
|
Report, other documents may also be submitted
|
Chris Marks 01273 335350
|
18 Jul 2023 |
Cabinet
|
External Audit Plan 2022/2023 This report sets out in detail the work to be carried out by the Council’s External Auditors on the Council’s accounts for financial year 2021/22.
|
|
|
Report, other documents may also be submitted
|
Ian Gutsell 01273 481399
|
18 Jul 2023 |
Cabinet
|
Ashdown Forest Trust Fund 2022/23 To inform Cabinet of the movements on the Trust Fund during 2022/23 and the closing position as at 31 March 2023.
|
|
|
Report, other documents may also be submitted
|
Andy Fowler 01273 481774
|
19 Jul 2023 |
Lead Member for Adult Social Care and Health
|
Homes for Ukraine - Extension of Support into Work Programme The Lead Member is asked to approve a 12 month extension to the Support into Work programme which is being delivered as part of the Homes for Ukraine Programme. Support into Work provides skills and employability training and language courses and supports access to local employment for Ukrainian guests and other migrant, refugee and asylum seeker groups living in East Sussex.
|
KD |
|
Report, other documents may also be submitted
|
Miranda Shawcross 01273 335338
|
24 Jul 2023 |
Lead Member for Education and Inclusion, Special Educational Needs and Disability
|
Proposed reorganisation of Grove Park School To consider the outcome of a consultation to reorganise Grove Park School, and, if appropriate, to seek approval to publish a statutory proposal.
|
KD |
|
Report, other documents may also be submitted
|
Gary Langford 01273 481758
|
July 2023 |
Director of Communities, Economy and Transport
|
Transport for the South East technical call off contract The Director will approve the contract award for the Transport for the South East technical call off contract, that will allow for the delivery of our technical programme.
|
P
KD |
|
Report, other documents may also be submitted
|
Jasmin Barnicoat 01273 481892
|
July 2023 |
Chief Operating Officer
|
Award of contract for IT device supply and associated services To approve the award of contract to the recommended supplier for the supply of end-user IT devices (laptops, & desktops) and associated services. The contract will be used to refresh the existing corporate estate, and for any other business as usual or project device needs.
|
P
KD |
|
Report, other documents may also be submitted
|
Matt Scott 07552 286752
|
31 Aug 2023 |
Lead Member for Adult Social Care and Health
|
Commissioning East Sussex Community Network (ESCN) To agree the East Sussex Joint Community Mental Health Commissioning of core services known as the East Sussex Community Network (ESCN). This project is to recommission all community provision in scope (£4,500,000), aligning support with emerging mental health transformation, and Emotional Wellbeing Services (EWS) in Primary Care, ensuring compatibility and interoperability through co-design and development. This is driven by local place-based priorities, including service users and their carers, NHS Sussex, East Sussex Local Authority, Primary Care Networks (PCN) and EWS workstreams. It will ensure that future services maximise the offers of support for people in their local communities.
|
KD |
|
Report, other documents may also be submitted
|
Kenny Mackay 01323 463946
|
25 Sep 2023 |
Lead Member for Transport and Environment
|
Petition to 'introduce a lorry route network similar to the one in West Sussex, so that HGVs are redirected away from narrow local roads in our villages' To consider whether the existing approach to freight movements in East Sussex, as set out in LTP3, needs updating and to consider HGV movements through Ringmer in order to respond to the petition calling on the County Council to introduce a lorry route network similar to the one in West Sussex.
|
KD |
|
Report, other documents may also be submitted
|
Lisa Simmonds, Tessa Sweet-Escott 0345 6080190, 0345 6080190
|
28 Sep 2023 |
Cabinet
|
East Sussex, Brighton & Hove and the South Downs NPA Waste and Minerals Plan Review To recommend to Full Council that; the modifications proposed to the Submission version of the Waste and Minerals Plan Review are published for statutory public consultation. These modifications are deemed necessary in order for the Plan to be found ‘sound’ and are in response to feedback received from the Planning Inspectorate following the Public Examination into the Plan in November 2022.
|
KD |
|
Report, other documents may also be submitted
|
Ed Sheath 01273 481632
|
28 Sep 2023 |
Cabinet
|
Report on the County Council's progress in becoming a carbon neutral council The agreed Notice of Motion covering ESCC’s declaration of a climate emergency committed the County Council to: report annually on its progress towards the target of achieving carbon neutrality from its activities as soon as possible and in any event by 2050.
|
|
|
Report, other documents may also be submitted
|
Andy Arnold 01273 481606
|
September 2023 |
Director of Adult Social Care and Health
|
Sexual Health Services Procurement Approve the award of the Specialist Sexual Health Contract that has been subject to competitive tender in line with the Lead Members decision to delegate the decision to the Director of Adult Social Care & Health on 20 April 2023.
|
KD |
|
Report, other documents may also be submitted
|
Tony Proom 01273 335252
|