Report to:
|
Lead Member for
Transport and Environment
|
Date of
meeting:
|
16 June
2025
|
By:
|
Director of
Communities, Economy and Transport
|
Title:
|
Transport and Works
Act Agreement - Rother Valley Railway
|
Purpose:
|
To seek authority to
enter into 2 Transport and Works Act Agreements with Rother Valley
Railway to allow agreed works to take place on the adopted public
highway.
|
1
Background Information
1.1.
The Transport Development Planning (TDP) team at East Sussex County
Council (ESCC) generally utilises Section 278 Agreements, under the
Highways Act 1980, in order to manage development related highway
works. The County Council’s Scheme of Delegation provides
delegated authority for authorised officers to enter into such
agreements. The proposal in this report concerns development
related highway works, which are not to be agreed under Section 278
of the Highways Act, and therefore delegated authority does not
exist for agreeing to enter into this alternative agreement.
1.2.
The proposal in this case is to secure the highway works relating
to the Transport and Works Act Order granted by the Department for
Transport (DfT) for the reinstatement of a railway line from Bodiam
to Robertsbridge Junction, which involves the installation of 2
level crossings over Junction Road, Bodiam and Northbridge Street,
Robertsbridge.
1.3.
A third level crossing will be built over the A21 (Robertsbridge
Bypass), but this will be agreed with National Highways as they
control this section of the A21.
2 Supporting Information
2.
2.1.
Planning permission for the scheme was applied for in 2014 under
planning application reference: RR/2014/1608/P. Permission was
granted by Rother District Council on 22 March 2017.
2.2.
In addition to the Planning Permission, due to the nature of the
works an Order needed to be granted by the Secretary of State for
Transport under the Transport and Works Act 1992. This was applied
for in April 2018.
2.3.
The Order would allow Rother Valley Railway to reinstate a section
of railway track, linking to existing sections of track that would
complete the rail link between Bodiam and Robertsbridge
Junction.
2.4.
The Order would provide statutory authority to construct the new
railway and maintain the new and existing lengths of track as a
heritage railway from Robertsbridge Junction to Bodiam, where it
would join the existing heritage railway to Tenterden. The Order,
if granted would also authorise the crossing of the public highway
in a number of locations.
2.5.
The Order would also authorise the acquisition of land and rights
over land and the temporary use of land in connection with the
railway, in case it is not possible to acquire the necessary
interests by agreement.
2.6.
A Public Inquiry for the proposed Order was held between 6 July
2021 and 4 August 2021 and 2-3 September 2021. Subsequently
the Planning Inspector issued their report in January 2023 and in
May 2023 the Secretary of State for Transport approved the Order
and published notice of its determination. The Order was made on 12
July 2023 and came into force on 2 August 2023.
2.7.
As the Transport and Works Act Order authorises Rother Valley
Railway to construct level crossings over the public highway, it is
not considered that a standard Section 278 agreement, for agreeing
the details of the work, is appropriate in this case.
2.8.
Bespoke agreements, albeit substantially similar to the Section 278
standard, have been agreed with Rother Valley Railway to ensure the
works are undertaken to the appropriate agreed design by a suitable
contractor and the Roads Safety Audit process is followed. The full
extent of the works on the County Council’s network are the 2
level crossings (Junction Road, Bodiam and Northbridge Street,
Robertsbridge) and their associated signage.
2.9.
It should be noted that the standard bond/surety provisions usually
contained in Section 278 agreements have been omitted due to the
powers granted to Rother Valley Railway through the Order under the
Transport and Works Act.
2.10.
Due to the bespoke nature of these agreements, they are not
covered by the County Council’s Scheme of Delegation to
officers. They therefore need approval from the Lead Mamber before
the agreements can be entered into.
3 Conclusion and Reasons for
Recommendations
3.
3.1.
In order to allow the legal agreements securing the highway works
to be entered into, and due to the unique nature of the development
and approval of the Transport and Works Act Order by the Secretary
of State for Transport, the Lead Member is recommended to approve
the use of the Transport and Works Act Agreements to secure the
highway works associated with the reinstatement of the Rother
Valley Railway..
Director of Communities, Economy
and Transport
Contact Officer: Mark
Weston
Tel. No. 01273 482242
Email: mark.weston@eastsussex.gov.uk
LOCAL
MEMBERS
Cllr Paul
Redstone
BACKGROUND
DOCUMENTS
·
Rother Valley Railway
(Bodiam to Robertsbridge Junction) Order inspector's
report
o
https://assets.publishing.service.gov.uk/media/6465054b0b72d300133446d5/rother-valley-inspectors-report.pdf
·
Rother Valley Railway
(Bodiam to Robertsbridge Junction) Order decision
o
https://assets.publishing.service.gov.uk/media/645a32c3c6e8970012a0fb55/rother-valley-decision-letter.pdf